Load out of the 2 offshore substation transition pieces on the River Scheldt in Belgium April 2011
Monday, 25 April 2011
The Sheerleg "Matador 3", Loading out over 1000 tonnes of Transition Pieces
Subscribe to:
Posts (Atom)
I am a Marine Engineering Consultant and CDM-C with PMSS, working on the largest or most prestigious offshore wind projects in the world, London Array, Dogger Bank and others in UK and European waters , with one of the worlds leading Wind, Wave & Tidal Energy Consultancies,